PGZ confirms launch of first Miecznik frigate: ORP Wicher to hit the water in 2026
Polska Grupa Zbrojeniowa (PGZ) has confirmed that the first frigate of the Miecznik programme, the future ORP Wicher, will be launched in August 2026. The announcement was made by Jan Grabowski, Vice President of PGZ responsible for naval projects, during the MSPO defence exhibition in Kielce.
business maritime economy investments navy pomerania shipbuilding industry defense industry tricity news05 september 2025 | 09:33 | Source: Gazeta Morska | Prepared by: Kamil Kusier | Print

fot. PGZ Stocznia Wojenna
Construction of the Wicher is already at an advanced stage. Once launched, the vessel will proceed directly into the waters of the Gulf of Gdańsk, unlike smaller ships which are typically floated out in dock basins. According to current plans, Wicher will enter operational service with the Polish Navy in 2028.
The second frigate, ORP Burza, will see its keel-laying ceremony in December 2025, with service entry scheduled for 2030. The third vessel, ORP Huragan, is expected to join the fleet around 2031/2032.
Based on Arrowhead 140
The Miecznik frigates are based on Babcock’s Arrowhead 140 design, adapted to Polish Navy requirements. Measuring over 140 metres, the ships will provide advanced air-defence capabilities, fitted with CAMM and CAMM-ER missile systems, 40 km-range naval guns, and anti-ship missiles with ranges beyond 200 km.
Their mission set will include air defence, escort of shipping lanes, protection of energy infrastructure, and participation in NATO’s Standing Naval Forces.
Poland’s largest naval modernisation programme
The Miecznik contract was signed in 2021 between the Armaments Agency and the PGZ Miecznik consortium. Originally valued at approximately PLN 8 billion, the contract grew to around PLN 15 billion after amendments concluded in late 2023.
At present, the backbone of the Polish surface fleet remains two Oliver Hazard Perry-class frigates, ORP Gen. T. Kościuszko and ORP Gen. K. Pułaski, transferred from the US Navy in the early 2000s.
Parallel naval projects
Alongside Miecznik, PGZ’s Naval Shipyard is also working on the rescue vessel „Ratownik”, with steel-cutting scheduled for November 2025. Additionally, PGZ’s Centre for Maritime Technology is developing the Digital Baltic programme, a real-time maritime situational awareness and communication system.
Buy us a coffee, and we’ll invest in great maritime journalism! Support Gazeta Morska and help us sail forward – click here!
Kamil Kusier
redaktor naczelny
comments
Add the first comment
see also
Orlen discovers Sissel gas field in the North Sea
The Polish flag: twenty years of drift and a belated change of course. More than just the white-and-red
Jantar Unity ready for service. Is it time for the Polish flag?
Poland as a stable gas supplier for the region and strengthening supply security
Port Haller: Poland’s new strategic gateway on the Baltic Sea
Jantar Unity: modernization of POLSCA fleet and Baltic ro-pax shipping
ORP Henryk Zygalski launched at Remontowa Shipbuilding under Saab Kockums program
US government allocates USD 13.8 million to rebuild shipbuilding workforce
ORLEN awarded new licences on the Norwegian Continental Shelf
ORP Drużno returns to service following intermediate dock repair
ADVERTISEMENT
ADVERTISEMENT