Skip to content
Partners

New multi-functional AMW building in Gdynia — an investment for modern armed forces

On March 14, 2025, the opening ceremony of the new multi-functional building at the Polish Naval Academy (AMW) in Gdynia took place. This strategic investment, aimed at enhancing military infrastructure and improving training quality, marks a significant step in modernizing the educational and logistical facilities of the Polish armed forces.

A multi-storey glass and metal academy building seen past bare trees and a lawn
fot. Krzysztof Miłosz / Akademia Marynarki Wojennej

In brief

The Polish Naval Academy in Gdynia opened on 14 March 2025 a new 50-metre-tall multifunctional building with 200 beds, catering facilities, a conference hall and a fitness room. Construction was carried out by Mirbud S.A. from 2022 to December 2024, to a design by KOWALSKI Architekci Sp. z o.o. of Gdynia selected in a competition decided in 2020. The building has a total floor area of 13,389.2 square metres and a volume of 50,000 cubic metres, and 742 tonnes of steel and 7,800 cubic metres of concrete were used.

The ribbon was cut by, among others, Stanisław Wziątek, undersecretary of state at the Ministry of National Defense, Beata Rutkiewicz, Pomeranian voivode, Jakub Mykowski, director of the department of military education at the Ministry of National Defense, vice admiral Jarosław Ziemiański, inspector of the navy, and the host of the event — rear admiral prof. dr. Tomasz Szubrycht, rector-commandant of the Polish Naval Academy. The event was also attended by commanders and heads of military units, representatives of the Ministry of National Defense, the navy, local government, clergy, and the academic community.

Modern facilities for education and training

The new building, located within the existing academic complex, serves training, accommodation, and dining functions. It was designed to host specialized and advanced courses for professional soldiers — not only from the navy but also from other branches of the armed forces.

The facility offers 200 accommodation spots, full catering facilities, and educational spaces. Additionally, it houses a conference hall and a modern fitness room, enabling physical activity for soldiers after classes. A vital part of the investment is also a transformer station and full technical infrastructure, ensuring energy independence and smooth operation.

Sustainable infrastructure

The building is equipped with a photovoltaic system, highlighting AMW’s commitment to modern and eco-friendly solutions. The design, created by Kowalski Architekci Sp. z o.o. from Gdynia, emerged from a competition settled in 2020. The design and cost documentation were completed between 2020 and 2021, with construction carried out by Mirbud S.A. from 2022 to December 2024.

Key technical specifications:

  • Building height: 50 m
  • Height above sea level: nearly 80 m
  • Steel consumption: 742 tons
  • Concrete consumption: 7,800 m³
  • Building footprint: 1,116.6 m²
  • Total area: 13,389.2 m²
  • Usable area: 9,757.07 m²
  • Volume: 50,000 m³

An investment for the future

Rear admiral prof. dr. Tomasz Szubrycht emphasized during his speech that the building will serve not only as a place for learning but also for physical development, creating comprehensive conditions for course participants. In a letter from deputy prime minister and minister of national defense Władysław Kosiniak-Kamysz, it was highlighted that the investment will contribute to improving education quality, developing professional competencies, and fostering values essential to military service.

Undersecretary of state Stanisław Wziątek pointed out the role of military academies in the context of current threats. He stressed that while technical modernization is essential, preparing soldiers and commanders for the challenges of today’s battlefield is crucial.

The investment was predominantly financed by the Ministry of National Defense. The modern AMW infrastructure in Gdynia is not only a step forward in the navy’s development but also an example of a strategic approach to modernizing the Polish armed forces, building competencies, and enhancing the combat readiness of future officers and commanders.

Gdynia has gained yet another modern facility that fits into the dynamic development of military infrastructure and underscores the region’s importance to Poland’s maritime security.

Source: Gazeta Morska · Compiled by: Kamil Kusier

Kamil Kusier executive editor All articles by this author →

Comments (0)

The discussion is moderated by the editors: a comment appears after review. Your e-mail address is not published.

Nobody has commented on this article yet.

Add a comment

0 comments

Related articles