Strategic lease opportunity next to the Baltic Sea’s largest container hub
The Port of Gdańsk Authority has announced a tender for the lease of a prime 3.3-hectare commercial site, located directly adjacent to Baltic Hub – the largest and fastest-growing container terminal on the Baltic Sea. This is a rare opportunity for companies in the logistics, forwarding, and intermodal transport sectors to secure a highly advantageous location within one of Europe’s most dynamic seaports.
In brief
Port of Gdańsk Authority (Zarząd Morskiego Portu Gdańsk S.A.) announced a tender for the lease of a 3.3 ha investment site next to the Baltic Hub container terminal. The property on Kontenerowa Street is paved with reinforced concrete slabs measuring 150x300x15 cm and provides access to the Sucharski Route, the A1 motorway and the S7 expressway. The lease covers a fixed term of 5 years, site visits are scheduled for 6 and 11 August 2025, and questions are accepted until 22 August 2025. Bids must be submitted by 9 September 2025 at 12:00 at Zamknięta Street 18 in Gdańsk.
Ready-to-use infrastructure for immediate operations
The site offers a plug-and-play solution. The land has been reinforced with precast concrete slabs (150 x 300 x 15 cm) laid on a compacted sand-gravel subbase, making it suitable for heavy equipment and oversized cargo operations. This eliminates the need for costly and time-consuming ground preparation, allowing future tenants to launch operations almost immediately.
Direct access to key road corridors
Located on Kontenerowa Street, the site offers excellent connectivity to major transport routes, including the Sucharskiego Route, the Southern Gdańsk Bypass, the A1 motorway, and the S7 expressway towards Warsaw. In addition, the tunnel under the Martwa Wisła River provides fast access between the eastern and western parts of the port and city.
Because the site lies within the administrative area of the port, transporting oversized cargo only requires approval from the Port of Gdańsk Authority, eliminating the need for permits from municipal road authorities. This results in significant time and cost savings for operators.
Rail access and sustainability benefits
The site borders a public rail loading track, offering smooth integration into intermodal supply chains. With rail transport playing a growing role in EU decarbonisation strategies, this adds further operational and environmental value. The Port of Gdańsk continues to expand its rail infrastructure in line with global sustainability goals and to support more resilient, low-emission logistics.
Tender details:
- Lease term: Fixed 5-year agreement
- Site visits: August 6 and August 11, 2025
- Deadline for inquiries: August 22, 2025
- Offer submission deadline: September 9, 2025, by 12:00 PM (CET)
- Submission address: Port of Gdańsk Authority SA, ul. Zamknięta 18, 80-955 Gdańsk, Poland, General Office.
Source: Gazeta Morska · Compiled by: Oskar Wojciechowski
Related articles
Energy and offshore Equinor takes over Bałtyk 2 and 3 O&M base in Łeba. Port to serve 1.44 GW of offshore wind for 30 years
Navy and defence Port Gdański Eksploatacja secures NATO NCAGE code. Gdańsk port company lines up for defence tenders
Shipbuilding industry Ex-Enterprise towed to Mobile under $418.5m contract. Test case for Nimitz-class disposal begins
Energy and offshore Energa renames Gdańsk gas plant company as foundations for 6,000-tonne turbine and boiler are laid
Equipment and technology WB Group takes Polish drones from Tokyo to SOFEX in Jordan in a single week
Ports and logistics PGE books Gdańsk’s T5 terminal for the long haul: Baltica 2 first, then more offshore wind farms
Comments (0)
The discussion is moderated by the editors: a comment appears after review. Your e-mail address is not published.
Nobody has commented on this article yet.