Poland accelerates offshore wind development with Baltic Towers launch
Poland is solidifying its position as a key player in Europe’s offshore wind sector. The Baltic Towers facility in Gdańsk – now the largest and most advanced offshore wind tower factory in Europe – is set to begin production next week. This strategic investment strengthens the national offshore supply chain and boosts Poland’s energy security.
In brief
Baltic Towers is completing construction of an offshore wind tower factory in Gdańsk, described as the largest and most modern in Europe, with the launch scheduled for next week. The plant on Ostrów Island will reach full production capacity by the end of November 2026, will produce more than 150 towers a year and will employ 500 specialised workers. Baltic Towers was established in 2023 as a joint venture of the Industrial Development Agency and Spain's GRI Renewable Industries. Prime Minister Donald Tusk announced during a visit to the plant measures against sabotage threats in the Baltic Sea.
Prime Minister Donald Tusk, who visited the plant ahead of its operational launch, praised the initiative and emphasized the importance of Polish ownership and participation in key infrastructure projects:
- It was a strategic goal for us to ensure that as much as possible of these investments remain in Polish hands. If Poland is to become one of the European leaders in Baltic offshore development, it’s vital that what we produce for wind energy is made right here, in Poland, in Gdańsk,
said Prime Minister Tusk during a press conference at Baltic Towers.
A Polish-Spanish joint venture powering Europe's energy transition
Baltic Towers was established in 2023 as a joint venture between Poland’s Industrial Development Agency (ARP) and Spanish manufacturer GRI Renewable Industries, a global leader in wind energy components. The collaboration combines international expertise with Polish industrial capabilities to deliver one of the most important offshore wind infrastructure projects in Europe.
- We are playing in the Champions League, because the offshore wind market is extremely demanding. We are securing key components for the supply chain, said Jakub Wnuczyński, CEO of Baltic Towers.
Located on Ostrów Island in Gdańsk, the facility is designed to manufacture over 150 offshore towers annually. The factory is expected to reach full production capacity by the end of November 2026, providing employment for 500 specialized workers and establishing a domestic hub for offshore wind tower manufacturing.
Infrastructure, security and supply chain resilience
According to the Prime Minister, investments like Baltic Towers are not only economically transformative but also strategically critical for Poland’s energy independence:
- Access to affordable and reliable electricity for Polish citizens and businesses cannot be achieved without major investments on the Baltic coast and at sea, Tusk noted.
The Prime Minister also emphasized the need to safeguard this critical infrastructure from external threats:
- We will work intensively on the security of our investments – in the broadest sense, including military aspects. I’m referring to the threat of sabotage from the East, which has become increasingly common in this region, including the Baltic Sea, he warned.
The visit to Baltic Towers followed a security briefing at the Naval Operations Centre in Gdynia, where government and military officials discussed the protection of strategic infrastructure, including undersea cables connecting Poland and Sweden.
A top three offshore wind market in the EU
Poland is already the third-largest wind energy market in the European Union, following Germany and Denmark. The Polish part of the Baltic Sea offers optimal conditions for offshore development – strong and stable winds, shallow waters, low salinity, and minimal environmental or social conflicts.
According to the Wind Industry Hub Foundation, Polish professionals now make up 3% of the global offshore wind workforce – a figure expected to rise significantly as domestic infrastructure and expertise continue to expand.
- We are capable of executing high-impact projects effectively, in partnership with both Polish and international private sector players. We have everything it takes to grow Polish industry, support the national economy, and accelerate the ongoing transformation, said Wojciech Balczun, CEO of the Industrial Development Agency.
Closing his visit, Prime Minister Tusk emphasized the national significance of the Baltic Towers project:
- I am truly proud of what you’ve achieved so far. I will personally ensure that as many Polish companies as possible benefit from the fact that such extraordinary investments are being realized before our eyes.
Source: Gazeta Morska · Compiled by: Kamil Kusier
Related articles
Energy and offshore Equinor takes over Bałtyk 2 and 3 O&M base in Łeba. Port to serve 1.44 GW of offshore wind for 30 years
Navy and defence Port Gdański Eksploatacja secures NATO NCAGE code. Gdańsk port company lines up for defence tenders
Shipbuilding industry Ex-Enterprise towed to Mobile under $418.5m contract. Test case for Nimitz-class disposal begins
Energy and offshore Energa renames Gdańsk gas plant company as foundations for 6,000-tonne turbine and boiler are laid
Equipment and technology WB Group takes Polish drones from Tokyo to SOFEX in Jordan in a single week
Ports and logistics PGE books Gdańsk’s T5 terminal for the long haul: Baltica 2 first, then more offshore wind farms
Comments (0)
The discussion is moderated by the editors: a comment appears after review. Your e-mail address is not published.
Nobody has commented on this article yet.