PEJ invests in road infrastructure around the first nuclear power plant
Polish Nuclear Power Plants (PEJ) have signed three-year framework agreements worth a total of PLN 24.85 million for the renovation, construction, and reconstruction of local roads in the Choczewo municipality, in the area of Poland's first nuclear power plant. These investments will not only improve the quality of road infrastructure but also reduce potential inconveniences for residents and tourists.
In brief
Polskie Elektrownie Jądrowe signed three-year framework agreements worth a total of PLN 24.85 million for the repair, construction and reconstruction of local roads in the municipality of Choczewo, in the area of Poland's first nuclear power plant. The agreements were concluded with five Polish companies, including three from Pomerania. In 2025, the repair of fire road number 7 to Gajówka and the reconstruction of routes from Słajszewo to the sea, together with bridge structures, are planned. The first works are to begin at the turn of the first and second quarters of 2025.
Strategic improvement of road infrastructure
The agreements were concluded with five Polish companies, including three from Pomerania. The scope of work includes both the modernization of existing routes and the construction of new sections that will improve communication in the investment area.
– We know how important the condition of local roads is for the Choczewo community. Investments in road infrastructure are an essential element of the power plant construction project and a way to minimize inconveniences for residents and tourists – emphasizes Magdalena Wasiluk-Hassa, Director of the Accompanying Infrastructure Division at PEJ. – Thanks to framework agreements, we will be able to efficiently conduct post-execution proceedings and carry out necessary modernizations.
Benefits for residents and tourists
The investments carried out under the signed agreements will not only facilitate access to the power plant construction site but also improve the region's tourist accessibility. Of particular importance is the modernization of roads leading from Słajszewo to the sea, including the reconstruction of bridge structures.
– We want to minimize the inconveniences associated with the implementation of this strategic investment as much as possible. Therefore, it is crucial that the funds allocated for road infrastructure support not only the investment needs but also improve the quality of life for residents and promote tourism development – says Jarosław Bach, Mayor of Choczewo Municipality.
Planned works in 2025
This year, PEJ plans to renovate and modernize, among other things, Fire Road No. 7, leading to the village of Gajówka. This route, leased from the Regional Directorate of State Forests in Gdańsk, is an important element of the local road network. Additionally, the reconstruction of communication routes leading to the sea from Słajszewo is planned, which will facilitate both the daily lives of residents and the development of the local tourism economy.
The first works are set to begin at the turn of the first and second quarters of 2025. The modernization of road infrastructure in the area of the nuclear power plant is a key element in the development of the Choczewo municipality and an important step towards increasing the accessibility and transport safety of the entire region.
Source: Gazeta Morska · Compiled by: Kamil Kusier
Related articles
Energy and offshore Equinor takes over Bałtyk 2 and 3 O&M base in Łeba. Port to serve 1.44 GW of offshore wind for 30 years
Navy and defence Port Gdański Eksploatacja secures NATO NCAGE code. Gdańsk port company lines up for defence tenders
Shipbuilding industry Ex-Enterprise towed to Mobile under $418.5m contract. Test case for Nimitz-class disposal begins
Energy and offshore Energa renames Gdańsk gas plant company as foundations for 6,000-tonne turbine and boiler are laid
Equipment and technology WB Group takes Polish drones from Tokyo to SOFEX in Jordan in a single week
Ports and logistics PGE books Gdańsk’s T5 terminal for the long haul: Baltica 2 first, then more offshore wind farms
Comments (0)
The discussion is moderated by the editors: a comment appears after review. Your e-mail address is not published.
Nobody has commented on this article yet.