Energa Wytwarzanie and Naviga Wind Power launch advanced blade protection system at Karcino Wind Farm
Energa Wytwarzanie, a subsidiary of ORLEN Group’s Energa, has completed an upgrade of one of its turbines at the Karcino Wind Farm to test a new generation of leading-edge protection technology developed by Naviga Wind Power. The system is designed to enhance blade aerodynamics, mitigate erosion effects caused by harsh coastal conditions, and extend operational lifespan by up to five years.
In brief
Energa Wytwarzanie of the ORLEN Group has modernised one of the turbines at the Karcino wind farm, testing the Naviga Leading Edge Performance blade leading edge protection system. The Naviga Wind Power solution is based on a multilayer material structure resistant to degradation and a modular design allowing quick installation in offshore conditions. The first test results and efficiency analyses are scheduled for 2026 and are to serve as a benchmark for further deployments on the group's wind assets.
The Naviga Leading Edge Performance solution features a multilayer material architecture engineered for durability and aerodynamic efficiency. Its streamlined installation process enables rapid on-site deployment, reducing service windows and preserving energy output continuity—an essential factor in high-capacity wind assets operating in maritime climates.
This initiative not only strengthens Energa’s maintenance capabilities within the Baltic wind corridor but also contributes to the development of domestic technological competence. By partnering with Naviga Wind Power, the company aims to reduce reliance on foreign suppliers and pave the way for a more resilient, locally integrated offshore wind supply chain. Performance assessments and inspection data will be collected through 2026 to evaluate scalability across other wind infrastructure.
Source: Gazeta Morska · Compiled by: Kamil Kusier
Related articles
Energy and offshore Equinor takes over Bałtyk 2 and 3 O&M base in Łeba. Port to serve 1.44 GW of offshore wind for 30 years
Navy and defence Port Gdański Eksploatacja secures NATO NCAGE code. Gdańsk port company lines up for defence tenders
Shipbuilding industry Ex-Enterprise towed to Mobile under $418.5m contract. Test case for Nimitz-class disposal begins
Energy and offshore Energa renames Gdańsk gas plant company as foundations for 6,000-tonne turbine and boiler are laid
Equipment and technology WB Group takes Polish drones from Tokyo to SOFEX in Jordan in a single week
Ports and logistics PGE books Gdańsk’s T5 terminal for the long haul: Baltica 2 first, then more offshore wind farms
Comments (0)
The discussion is moderated by the editors: a comment appears after review. Your e-mail address is not published.
Nobody has commented on this article yet.